Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the oshin domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the redux-framework domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114
Bellway Homes Nine Elms – Leander Royds Alternatives
2015

Bellway Homes

The Residencies, Nine Elms
London Build to Rent
  • Advised Bellway homes on the funding of a scheme in Nine elms, Central London totalling 114 apartments with a value of c£65,000,000

  • First scheme in London to have a 15 year covenant attached to it as part of the section 106.

  • Undertook a full market review to seek funding of “The Residences” and identified L&Q